# ThinkSpatial Project File Structure
# 01 – ClientJob Info
• Place all data received from clients in this directory and all files relevant to the project • These usually consist of drawings or DWGs etc – Initial data – not design info • Specific standards required for the project • Initial information about the project
# 02 - Sitewide
All information in this directory if for overall files
# 02.01 Feature Survey
• Place all feature surveys requested through the project into here • Include the initial feature survey from the client if received
# 02.02 Services
• To be confirmed
# 02.03 Boundary
• Boundary files to be stored here, including project boundary, and cadastral boundaries for projects etc
# 02.04 Monitoring
• If monitoring is required place all monitoring data here
# 02.05 Machine Control
• When machine control is required, place setout files for machines here
# 02.06 Survey Control
• All survey control files and processing results here
# 02.07 Safety
• TRA’s, AMS, incidents all to be placed here, including any updates and revisions of documents
# 02.08 SurveyManual
• Place survey manual here
# 03 Data Management
TO BE CONFIRMED
# 04 - WorkingFolder
- All day to day survey work to be put in here.
- This area is to contain setout and asbuilt files for all areas
- Working folder file and folder names to be abbreviated for simplicity
- File names within folder to match folder names to continue tracability – this should flow through to the survey setout files as well
- General folder structure should adhere to something along the lines of:
- Disicpline
- Area
- This should can contain a master asbuilts progress file that should have the design and all relevant asbuilt dwgs xrefed in to quickly view the progress of asbuilts and identify any missing data
- Feature of area
- Setout data of feature - Setout folders to have S in the folder and subsequent files names
- Working data of feature – general processing or working folder (Working folder to have W in the folder and subsequent file names
- Asbuilt data of feature - theoretically each setout folder should have at least one corresponding asbuilt folder and is to contain the asbuilt data and all reports (working and deliverables)
- Asbuilt folder should contain a master DWG (with a name that doesn’t change) and any report/spreadsheets should be dated in the filename
- ANY DELIVERABLE FILES MUST BE DATED IN THE FILE NAME
- Feature of area
See below for examples of folder structures – This should eliminate any duplication of setout files and asbuilt reports etc
# 04.01 Buildings
Folder abbreviation – BU
- If buildings are in the project all information to be put here
- BU.01 Building #1
- BU.01.01 Foundations
- etc
# 04.02 Civil
Folder Abbreviation – CI
- Earthworks information, including CSR, volumes, batters etc
- CI.01 Earthworks
- CI.01.01 Subgrade
- etc
# 04.03 Roads
Folder Abbreviation – RD
- Road designs, setout and asbuilt files for roadworks
- RD.01 Swanston St
- RD.01.01 Subgrade
- RD.01.01.S01 Setout file
- RD.01.01.A01 Asbuilts
- RD.01.02 Basecourse
- RD.01.01 Subgrade
- RD.02 Victoria St
- etc
# 04.04 Rail
Folder Abbreviation – RA
- Rail Alignment
- ST.01 Camp Rd
- ST.01.01 Piles
- ST.01.01 Piles
- ST.01.01.S01 Pile setout
- ST.01.01.S01CampPileIFC.csv
- ST.01.01.A01 Starter Bar AB
- ST.01.01.A02 Pile AB
- ST.01.01.A03 Verticality checks
- ST.01.01 Piles
- ST.01.02 Pile Cap
- ST.01.02.S01 Earthworks
- ST.01.02.S02CampEwks.ttm
- ST.01.02.W01 Earthworks working version
- ST.01.02.W02 Earthwork volumes
- ST.01.02.S02 Pile cap
- ST.01.02.A01 PileCap AB
- ST.01.02.S01 Earthworks
- ST.01.03 Deck
- ST.01.03.S01 Blinding Setout
- ST.01.03.S02 Deck Setout
- Etc
# 04.05 Services
Folder Abbreviation – SE All service locating survey files and any new service installations
- SE.01 Parkville
- SE.01.S01 Drainage
- SE.01.S02 Gas
- SE.01.W01 Gas bore sections
- SE.01.W02 Overheads plan
- SE.01.A01 Drainage
- SE.01.P00 Service Pickups
- THIS FOLDER TO BE USED AS ARCHIVE FOR ALL SERVICS PICKUPS ie. NDD, Trace pickups during day to day activities – added as Wxx system was being overwhelmed and getting messy/drawings getting lost etc • 04.05.02 Arden •o 04.05.02…….
# 04.06 Structures
Folder Abbreviation – ST
- Structures, bridges, RW Etc here
- ST.01 Camp Rd
- ST.01.01 Piles
- ST.01.01 Piles
- ST.01.01.S01 Pile setout
- ST.01.01.S01CampPileIFC.csv
- ST.01.01.A01 Starter Bar AB
- ST.01.01.A02 Pile AB
- ST.01.01.A03 Verticality checks
- ST.01.01 Piles
- ST.01.02 Pile Cap
- ST.01.02.S01 Earthworks
- ST.01.02.S02CampEwks.ttm
- ST.01.02.W01 Earthworks working version
- ST.01.02.W02 Earthwork volumes
- ST.01.02.S02 Pile cap
- ST.01.02.A01 PileCap AB
- ST.01.02.S01 Earthworks
- ST.01.03 Deck
- ST.01.03.S01 Blinding Setout
- ST.01.03.S02 Deck Setout
- Etc
# 04.07 Enviro
Folder Abbreviation – EN
- Tree Protection Zones, Environmental No Go Zones, Hertiage Areas
- EN.01 Moreland Rd
- EN.01.01 Trees
- EN.01.01.S01 Trees to be Removed
- EN.01.01.S01 Trees to be Retain
- EN.01.02 Herriage
- EN.01.02.W01 Heritage Areas
- EN.01.01 Trees
# 04.08 SiteLayout
Folder Abbreviation – SL
- Road Barriers, Site Gates, Site Compounds, Vehicle Access Etc.
- SL.01 Preston
- SL.01.A01 Road Barriers
- SL.01.A02 Gates
- SL.01.W01 Gate Numbers
# 04.09 Stations
Folder Abbreviation – SN
- Super T, Modules, Cranes, Concourse, Platform, Building Services, Lift Shafts Etc.
- SN.01 Bell
- SN.01.01 Super T
- SN.01.01.S01 SuperT
- SN.01.01.A01 SuperT AB
- SN.01.02
- SN.01.02.S01 Concourse
- SN.01.02.A01 Concourse AB
- SN.01.03 Concourse
- SN.01.W01 Concourse Grades
- Etc.
- SN.01.01 Super T
# 04.99 RawSurveyData
All raw survey data is here
Create a directory with your initials as your base directory
(YOUR INITIALS)
- YYMMDD (Date of work completed)
- RAW CSV,Job and Job Photos should be coppied into this location
- 04.99.INITIALS.YYMMDD_WorkDescription.DWG
- 04.99.TS.230405_Piles.DWG
- 04.99.TS.230405_Hardstand Subgrade.DWG
- If your survey data contains Services or Feature Survey copy them into the applicable job location
- Feature Survey -> D:\ThinkSpatial\Project Number - Description\02 SiteWide\02.01 FeatureSurvey\02.01.P00 FS Working Files
- Services -> D:\ThinkSpatial\Project Number - Description\04 WorkingFolder\04.05 Services\04.05.P00 Service Pickups
- YYMMDD (Date of work completed)
# 05 - AsBuiltDeliverables
TO BE CONFIRMED
# 06 - SurveySetoutFiles
- This is to contain all the files required to complete any survey work onsite
- Jobs are synced with onedrive on the controller and your computer. When changes are made in the office the controllers will be updated automatically
- When adding new files here the old files will need to be SS
- This should contain clean versions of the setout folders in the working directory
# 07 - Photos
- Any useful photos that have been taken in the field.